Full scaffold
The cost book now mirrors the current RSC outline all the way down, giving every standard, pricing note, field sequence, and QA checklist a permanent home.
Divisions
Section titled “Divisions” 1000 - 1999 General Conditions Office systems, sales, design, project management, staffing, trucks, tools, and company overhead.
2000 - 2999 Existing Conditions Demolition, utilities, code cleanup, health and safety risks, and existing-site constraints.
3000 - 3999 Site Work Clearing, trenching, access, excavation, retaining work, landscaping, and exterior groundwork.
4000 - 4999 Foundations Footings, frost walls, slabs, piers, ICFs, waterproofing, and below-grade prep.
5000 - 5999 Rough Structures Framing, sheathing, decks, porches, timber work, SIPs, and roof structure.
6000 - 6999 Thermal Envelope WRBs, roofing, siding, insulation, air sealing, membrane work, and drywall.
7000 - 7999 Exterior Finishes Exterior trim, cladding, openings, details, coatings, and weather-facing finish work.
8000 - 8999 Interior Finishes Stairs, cabinets, flooring, tile, trim, paint, fixtures, and final interior build-out.
9000 - 9999 Completion Punchlist, cleaning, commissioning, furniture, handoff, warranty, and closeout.
What belongs here
Section titled “What belongs here”Standards
Preferred methods and scope boundaries
Capture how RSC wants the work done, what is included, and where crews should escalate exceptions.
Estimating
Labor, materials, and pricing assumptions
Use each page to store the math, unit logic, vendor notes, and procurement assumptions behind the estimate.
QA and handoff
Checks, tolerances, and closeout guidance
Add field checkpoints, failure modes, warranty notes, and owner handoff instructions where they belong.