Cost book scaffold
Structured for steady drafting
Every TOC node already has a live page, so standards, pricing logic, QA notes, and field guidance can land in the right place from day one.
Divisions9
Pages2,590
ModeField-ready
SearchBuilt in
RSC BuilderBuddy
Field-ready cost standards, estimating logic, and build guidance for the RSC team.
What this version is ready for
Section titled “What this version is ready for”Browse fast
Navigate the whole cost book without guessing
The structure mirrors the current RSC table of contents all the way down, so crews and office staff land in the right section immediately.
Draft in place
Every scope already has a home
Use the scaffold to drop in standards, estimating assumptions, sequencing notes, vendor rules, QA checks, and handoff details.
Phone friendly
Built for job-site lookup
Starlight gives you search, strong mobile nav, and clean reading layouts so this can live on a laptop in the office or a phone in the field.
Browse by division
Section titled “Browse by division” 1000 - 1999 General Conditions Office systems, sales, design, project management, staffing, trucks, tools, and company overhead.
2000 - 2999 Existing Conditions Demolition, utilities, code cleanup, health and safety risks, and existing-site constraints.
3000 - 3999 Site Work Clearing, trenching, access, excavation, retaining work, landscaping, and exterior groundwork.
4000 - 4999 Foundations Footings, frost walls, slabs, piers, ICFs, waterproofing, and below-grade prep.
5000 - 5999 Rough Structures Framing, sheathing, decks, porches, timber work, SIPs, and roof structure.
6000 - 6999 Thermal Envelope WRBs, roofing, siding, insulation, air sealing, membrane work, and drywall.
7000 - 7999 Exterior Finishes Exterior trim, cladding, openings, details, coatings, and weather-facing finish work.
8000 - 8999 Interior Finishes Stairs, cabinets, flooring, tile, trim, paint, fixtures, and final interior build-out.
9000 - 9999 Completion Punchlist, cleaning, commissioning, furniture, handoff, warranty, and closeout.